Research Ideas and Outcomes : Grant Proposal
|
Corresponding author: Jesper Stage (jesper.stage@ltu.se)
Received: 29 Sep 2017 | Published: 05 Oct 2017
© 2017 Kristina Ek, Susana Goytia, Carina Lundmark, Soili Nysten-Haarala, Maria Pettersson, Annica Sandström, Johanna Söderasp, Jesper Stage
This is an open access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Citation: Ek K, Goytia S, Lundmark C, Nysten-Haarala S, Pettersson M, Sandström A, Söderasp J, Stage J (2017) Challenges in Swedish hydropower – politics, economics and rights. Research Ideas and Outcomes 3: e21305. https://doi.org/10.3897/rio.3.e21305
|
|
Two systems working in parallel have contributed to implementation difficulties in Swedish water governance. While the old system is designed to be predictable and stable over time, the new system is intended to be transparent and holistic, guided by the principles of Integrated Water Resource Management. The paper disentangles the challenges in Swedish water governance and proposes a blueprint for future research. The proposed research project is unique in the sense that it explores the imbalances between the new and the old water governance systems from a multi-disciplinary perspective, elaborating upon the clashes between the traditional, nationally based regulatory system and the new holistic water governance system from legal, political and economic perspectives.
hydropower, Sweden, water governance, water management systems
Severe shortcomings in the implementation of both the Water Framework Directive (WFD) and the Floods Directive have been identified in several Member States (
We argue that the above described implementation difficulties are largely due to the fact that two governance systems effectively work in parallel with regard to water. The fundamental differences, or even clashes, between the traditional legal system and the new holistic water governance system are outlined below.
Modern water governance has a holistic approach where ecological, political, economic and social perspectives are integrated (
The EU water regime represents a turning point in the Union’s water management, which challenges the institutional systems in the Member States (
From an economic perspective, management at the level of individual installations (i.e. hydropower plants) tends to understate both the costs and the potential benefits of the implemented measures compared to what could be achieved through management at the watershed level. Holistic management at the level of entire river systems could make it possible to restore ecosystem connectivity and restore migratory patterns of keystone fish species, potentially generating far greater economic benefits that can be achieved through measures in one installation alone. At the same time, the overall availability of balancing power in the electricity system (which is growing in importance) is barely affected at all by measures in an individual installation. However, if measures are implemented in a large number of installations, based on case-by-case assessments of effects in each individual installation, the overall availability of balancing power could be affected considerably, with huge economic effects. Thus, a more holistic approach would capture both costs and benefits of environmental improvement measures far better than the current approach does.
Although IWRM has the potential to provide greater benefits from water governance than the traditional, piecemeal, governance approaches, applying IWRM in practice has proven difficult, particularly so in rivers with hydropower development where permits remain site-specific. Permits granted under the 1918 Water Act (which is considered an exploitation-minded legislation,
In sum, we argue that the two management systems described above, working in parallel, have contributed to implementation difficulties in Swedish water governance. While the old system is designed to be predictable and stable over time, the new system is intended to be transparent and holistic, guided by the principles of Integrated Water Resource Management. In the following, we propose a multi-disciplinary research project to explain to what degree a holistic management approach is adopted and study the costs and benefits associated with the two approaches.
The aim of the proposed research project is to explore the variation in the water governance in relation to hydropower. We will study how the institutional challenges of IWRM play out in Swedish rivers strongly affected by hydropower development, with the overall objective to provide suggestions on how to obtain a more balanced governance system that incorporates the strengths of both the old and the new system in order to maximize overall benefits to society.
Case studies of legal, political and economic aspects reflecting the shift in governance in two water bodies, the Lule and Mörrum Rivers, will be accomplished. The project draws on institutional theory and elaborates on the policy arrangements of the involved actors, resources and rules. We will examine relevant documents on how the clash between the two governance systems is manifested and a mail survey will be sent to the actors involved, to identify their resources as well as their interactions. Survey data will also be used to estimate the economic effects of improved fishing along the two rivers, as well as the environmental values linked to restored ecosystem connectivity in the river systems. The project contributes with knowledge on how a holistic and resource efficient balance between improved water quality and renewable energy production can be achieved.
The proposed research project departs from the assumption that the two water governance systems reflect different institutional policy arrangements with different incentives for action. It is further assumed that implementation problems related to Integrated Water Resource Management (IWRM) are caused by clashes between these two systems and the fact that in practice the old system tends to overrule the new holistic approach.The project is based on institutional theory and the idea of path dependence [9,10]. While institutions – understood as the constellation of rules and decision-making procedures – provide stability they do not necessarily provide efficiency, in terms of fulfilling environmental goals and achieving social acceptance (
We draw on the Policy Arrangements Approach (PAA) to map and analyse the arrangements in which hydropower permit processes take place, focusing on four dimensions: rules, actors, resources/power, and discourses (
The first dimension – rules – focuses on the formal and informal rules of the policy arrangement. This dimension is strongly connected with the other dimensions since rules assign actors different incentives and power positions and define the procedure for decision-making (
The second dimension – actors and coalitions - implies research into the participation, positions, options available to, and interactions of the actors involved. Actors coordinate their actions and form coalitions to improve their stakes in the process. Hydropower is a conflict-ridden issue with many and often conflicting interests, e.g. power companies, environmental interests and sport fishing. Both the type of actors involved in the policy arena as well as the structure of coalitions (i.e. how they interact and the level of conflict between them) can be assumed to influence the hydropower permit processes. Thus, this step of the empirical analysis is to identify the involved actors and existing coalitions, i.e. collaboration patterns.
The third dimension – resources – captures the distribution of power and influence between the coalitions defined by means of RQ1. Power refers to the deployment of available resources, and influence how policy outcomes are determined. The core idea is that actors in a given policy coalition depend on each other to different degrees for resources, e.g. financial resources, information, or political legitimacy (
The fourth dimension - policy discourses – illustrates the views and beliefs of the actors involved in the particular case. Discourses reflect both general ideas about governance and ideas about the concrete policy problem at stake, i.e. water bodies affected by hydropower, addressing the character of the problem, its causes and possible solutions. Discourses at this level tend to hold coalitions together (cf. policy beliefs,
There is a fifth issue which is not linked to the four PAA dimensions but to the choice of policy framework: that of which economic costs and benefits to consider. Many costs and benefits (e.g. production losses and improved fishing linked to a new fish channel) will be the same regardless of the framework used. However, in the traditional framework it is natural to also consider effects on the local economy (linked e.g. to increased fishing tourism) which are less important in the holistic framework where only changes in overall spending in Sweden as a whole will matter. On the other hand, in the holistic framework it is natural to consider effects on the electricity system as a whole, linked to changed water storage in an entire river’s hydropower dams, as well as environmental values linked to reestablishing ecological connectivity and fish migration routes in a river system as a whole. Both types of effects can be ignored at the traditional level of individual hydropower plants, but not when decisions are made at the river system level.
Our empirical cases – Lule River and Mörrum River – illustrate how elements of the old institutional framework remain in place and how the new framework faces difficulties in implementation. However, the two cases diverge in regards to what degree; in Lule River the old framework dominates almost completely, whereas in Mörrum River important elements of the new framework have begun to affect governance decisions. We believe that these two river systems serve as different, yet typical, examples of Swedish water governance.The Lule River has 15 hydropower plants which account for roughly 25 per cent of Sweden’s hydropower. Due to this heavy hydropower regulation, the main river has little value for fishing or water-based ecosystems. Some of the old permits have subsequently been contested, for instance in the Letsi area along the Smaller Lule River, with diverging views on whether the conditions of the permits have actually been met; the ongoing political process linked to demands for changes in the conditions of the permit provides an interesting test case for many of the issues that appear in similar processes surrounding permits for hydropower plants elsewhere in the country; and there have been ex ante attempts to value the economic impacts of changes in the permits. With the implementation of the WFD and discussions of further changes in water legislation, a dialogue process on environmental improvement measures in the river is scheduled to begin in 2017 under oversight from national agencies; notably, there is widespread agreement among the key actors that this dialogue process will focus on studying measures at the installation level, in line with the traditional institutional framework.In the Mörrum River, the hydropower plants are far smaller and hence less valuable as components of the electricity system, and the high environmental values in this river, especially from the internationally famous salmon fishing, have ensured that national interest in environmental improvement measures has always been high. There have therefore been a series of environmental improvement measures carried out in different parts of the river system; most recently, there has been a court case affecting three upstream hydropower plants, as well as a voluntary agreement to tear down the hydropower plant closest to the sea where there is an agreement in principle but where the permit processes linked to removing the plant have yet to take place. Discussion of effects in the entire river system (as opposed to merely in the vicinity of each plant) played a key role in these recent policy processes, and this river system can therefore be seen as an example of a river where the more holistic, IWRM-related, institutional framework has begun to matter.
Data will be collected and analyzed using both quantitative and qualitative methods. At the beginning of the project, relevant legal and policy documents will be identified to examine how the clashes between the two governance systems are manifested at the different levels of the political and legal system; from bills and legislation at the national level, to river basin management plans, and individual permits for hydropower in our two selected river basins (RQ1). The legal analysis will also include voluntary arrangements that can have a significant and persistent influence on the legal situation. The analysis will be performed by qualitative content analysis using the key features of the two parallel governance systems as our framework for analysis (see Figure 1).To identify who the involved actors are in our two cases, their resources and their views of the policy problem and its solutions, we will use qualitative and quantitative document analysis and a mail-in survey (RQ2-RQ4). We will start by exploring the rich material that is made available at the respective Water Authorities’ websites after the most recent processes of consultation on water management plans and related documents. Prior to adopting these programs for action and administration, consultations about goals and strategies to reach them are always held, inviting various authorities, municipalities, the public and a wide range of stakeholders to voice their opinion (
The proposed research project sets out to explore the governance of two river systems and focuses on the permit processes for hydropower. The aim of the project is to explain the variation in the governance of hydropower plants as regards to what degree holistic and ecosystem-based governance approach is adopted and to study the costs and benefits associated with the older and newer governance approaches. The project draws on institutional theory and elaborates on the policy arrangements of involved actors, their resources and what rules (regulations and decision-making procedures) that govern their actions. The assumption is thus that explanations for lacking implementation of the holistic approach are to be found in these arrangements.
The proposed project is unique in the sense that it explores the imbalances between the new and the old water governance systems from a multi-disciplinary perspective, elaborating upon the clashes between the traditional, nationally based regulatory system and the new holistic water governance system from legal, political and economic perspectives.
In Sweden, strongly path dependent institutional frameworks struggle with opening up to new and growing environmental knowledge and aiming to holistic decisions in the conditions of multilevel governance (
This work was funded by the Renewable Energy Area of Excellence at Luleå University of Technology, Sweden.