Timeline of DiSSCo:

1.Proposal phase (2015-2018),

2.Preparatory Phase (2019-2022),

3.Transition Phase (2023-2024),

4.Construction Phase (2024-2025),

5.Operational (2026-2036).

 
  Part of: Koureas D, Livermore L, Alonso E, Addink W, Casino A (2023) DiSSCo Prepare Project: Increasing the Implementation Readiness Levels of the European Research Infrastructure. Research Ideas and Outcomes 9: e107220. https://doi.org/10.3897/rio.9.e107220